Electrical equipment must have a minimum 30 wide clear working space laterally in front of.
Electrical service panel height requirements.
Electric service panels have a number of different names.
Nec 110 26 requires electrical equipment including electrical panels to be located to provide required working clearances about the equipment.
Fuse box fuse panel circuit breaker panel today most homes have what is officially called the electrical service panel or simply the service panel a circuit breaker panel is not exactly the same as the fuse box because it has mechanical toggle switch circuit breakers not fuses but.
Circuit breaker service panels and fuse boxes.
Three of these standards concern the box location clearance and space around the box and box height.
Nec 230 54 electrical services service entrance raceways shall be rain tight and arranged to drain.
The circuit breaker at the top of the box may not be higher than 6 foot 7 inches from the floor.
Its purpose is to assist electrical contractors engineers architects and manufacturers engaged in the installation of electrical service wiring and equipment.
Nec 230 70 electrical services the service disconnecting means shall be installed at a readily accessible location either outside a building or structure or inside nearest the point of entrance of the service entrance conductors.
Service drop height requirements.
The second sentence in 110 26 a 3 states that within this section s height requirements other equipment located above or below the electrical equipment can extend beyond the front of the equipment but the difference in depth shall not be more than 6 inches.
A permanent platform must be below the panel box if the top circuit breaker exceeds this specific height.
According to the 2008 national electrical code most residential electrical panels require at least a 3 foot clearance or working space in front 30 inches of width and a minimum headroom clearance of 6 feet or the height of the equipment whichever is greater.
The national electrical code has a few restrictions on where electrical panels may be located as follows.
If obstacles would make it unsafe for you to inspect the service panel you have.
Minimum height requirements for service drop cables are determined by the local building or electrical codes but most follow the recommendations of the national electrical code nec.
A height limit applies to mounting a panel box.
The nec requirements say that electrical equipment must be in an area measuring 30 inches.
The esr manual provides guidance and instructions pertaining to electrical service connections.
These standards set the minimum safety standards for panel boxes.